For Australian builders Contact Support AUNZ

Platform / SWMS sign-on

SWMS your crew reads and signs on site

Start from a template, adapt it to the job, and switch it on for the sites it applies to. Workers read it on their phone and sign before they start.

A template library to start from

Starter templates for high risk construction work: roof work, EWPs, excavation, mobile plant, demolition, asbestos, electrical, traffic, concrete pours, propping and confined spaces. Written with reference to the model WHS Regulations, Safe Work Australia codes of practice, and Victoria’s OHS laws for Victorian sites.

Edit it like a document

Steps, hazards, controls, risk ratings, PPE, licences and emergency procedures in one simple editor. No Word files to email around.

Signed on the phone

Workers pick the SWMS for today’s task from the QR page, read it in plain language and sign. It works offline too.

Every version kept

Change a live SWMS and it becomes a new version. Each signature records which version the worker signed.

Print with the sign-on register

Print or save any version as a PDF with its list of signatures, ready for a client or an inspector.

Toolbox talks too

Each attendee signs on their own phone, so there’s no sheet to pass around the smoko table.

Put your next site on Inducta Flow

  • Set up a site and print its QR sign in about ten minutes
  • No app or login for workers, and it works with no signal
  • Unlimited workers and forms; you pay for the business, not the headcount
  • Built for the WHS laws in your state or territory
  • 14 days free, no card needed